top of page

West Linn Deck Replacement


After a lot of time and changes (due to requests of the planning division of west linn) we put up a 40ft, 1500lb beam, with 11 guys. There was no access in using machinery of any kind so man power it was.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page